Newport House, Bow
Having been commissioned via a Pre-Construction Services Agreement (PCSA) to undertake site investigations at Newport House, a residential development located in Bow, London, Lawtech undertook the removal of the existing Trespa HPL balcony and walkway infill panels and replacement with new non-combustible aluminium façade panels. Newport House remained occupied throughout the project and, as such, constant emphasis was placed on ensuring the safety of the residents and minimising disruption.
Due to the scope of works and the size of the development, it was decided that the works could be carried out more efficiently via abseiling. Site surveys were conducted prior to the installation of abseiling access equipment and abseil level 3 technicians carried out thorough inspections. Only fully trained and competent operatives holding IRATA qualifications were used to conduct the works to ensure both the safety of the operatives and high quality workmanship.
Following the works, one of the directors at Clarion expressed that they were impressed with the use of abseilers, further noting that it was less disruptive for the residents.
Related projects.
View more
180 Stratford High Street
Lawtech have recently completed the removal and replacement of combustible rainscreen and EWI cladding at three adjoining mixed-use residential and retail blocks in Stratford.
Read more
Stepney Way & Stepney Green, Stepney
Lawtech completed the removal and replacement of combustible timber rainscreen cladding in balcony areas at Stepney Way and Stepney Green located in Stepney, London.
Read more
Parkside St. Peter’s Phase 1
Completing the first phase of a three-phase project at an 8-storey residential development located in Battersea, Lawtech undertook the removal and replacement of the existing combustible ACM cladding.
Read more
Outlook Building, Portsmouth
Lawtech undertook a remedial programme to replace defective cladding suffering from water ingress.
Read more
Messenger Court, Bermondsey
Lawtech undertook the ACM replacement of an occupied residential block in Bermondsey.
Read more
Dairy Close, Parsons Green
Lawtech completed a full cladding replacement to five mid-rise blocks on behalf of L&Q, with the project being nominated for an award by LABC.
Read more
Clyde Terrace, Forest Hill
Following a programme of site investigations Lawtech undertook the replacement of high level cladding on several mid-rise blocks.
Read more
Edward Woods Estate, W11
External Wall Insulation delivered both thermal benefits and a welcome acoustic buffer from the street sounds of this bustling urban estate.
Read more
Holly Park, Islington
Holly Park is a unique External Wall Insulation (EWI) scheme that balances the need for energy efficiency with restrictive planning requirements.
Read more
Mottram Towers, Stockport
Multi-disciplinary works at 1,050 dwellings across a range of three-storey tenements and high-rise towers across various locations in Stockport.
Read more
Borough Wide Refurbishment, Southwark
As part of an Energy Efficiency drive, Southwark Council embarked upon a two year programme of refurbishment using considerable ECO funding secured by Lawtech.
Read more
Willenhall, Coventry
In January 2016 Lawtech Group started its first job for Whitefriars Housing. Works looked to improve the thermal comfort and aesthetics of three residential blocks of flats. The blocks totalled 39 homes.
Read more