Lawtech was appointed Principal Contractor to carry out rectification works to a failing Powerwall façade system previously installed by others.

Our Scope of Works comprised:

  • the removal of the failing cladding
  • the installation of an NHBC-compliant Alsecco insulation system with an acrylic brick slip and render finish installed onto an existing metal frame
  • replacement/reinstatement of extensive metal flashing

Particular attention was taken in respect of the scaffold erection, ensuring that the strike sequence enabled the works to be finished to the client’s satisfaction upon completion.  

Lawtech provided a 10-year insurance-backed guarantee for the work completed at Norway Wharf.